Metro de Quito
Description
The Quito metro will stretch from stations Quitumbe to El Labrador with capacity to transport up to 400,000 passengers/d. The line will run 22km with 15 stations and connect to existing transport corridors at 37km/h. The system will operate using 18 electric trains and 130 rail cars. Passengers will be able to travel north from Quitumbe to the Mariscal Sucre airport in 30 minutes, a route which currently takes two hours.
No comments:
Post a Comment